AquaEnergy Expo is a global exhibition in the water and energy field which includes a magazine, a Knowledge hub, and a virtual expo.

Menu
Optioneering and FEED (Front End Engineering Design) Contracts
(0 reviews)
Get Price
(305) Views
(0) Contacts


Contact Company

ERG Group
Dubai, UAE
(825) Views
(0) Contacts

There is often demand to reduce the odor impact of existing sewage treatment plants. Some of the reasons for this pressure include new projects near the site border, procedures that need more odour treatment, or older OCUs that are nearing the end of their useful lives. ERG can assist in outlining the options that are available for improving current assets as well as the preliminary engineering needed to define or release formal project budgets for implementation. We offer design work completed by our staff of chartered and graduate engineers at low prices. 

Every time, the design result is customized to the project's requirements; typical deliverables include:
  • A summary study outlining the alternatives between buying new OCUs and improving or reusing existing odor control assets.
  • Technical and construction specifics of each option's benefits and drawbacks
  • Significative Costs of CapEx and OpEx for significant options
  • initial engineering design for the chosen course of action, which is added to the official project specification
  • Learn how this strategy helped Southern Water at Eastney and a few other ERG clients who have recently improved the smell management at their sites by reading about their large-scale odour control initiatives.

Product Reviews
You must Login/Register to can submit your review

All Rights Reserved to AquaEnergy Expo © 2025