AquaEnergy Expo is a global exhibition in the water and energy field which includes a magazine, a Knowledge hub, and a virtual expo.

Menu
PVC TWO-PIECE BALL VALVEFULL PLASTIC HANDLE (ORDINARY)
(0 reviews)
Get Price
(400) Views
(0) Contacts


Contact Company

Taizhou Zhuoxin Plastics Co., Ltd. (SAM-UK)
Zhejiang, China
(1081) Views
(0) Contacts

Setting up and Examining
① Pipe cutting: the necessary pipe can be cut by hand or by machine, depending on the needs of the application, after the proper length has been measured. When cutting, make sure both ends are straight and vertical. Use a file to remove burrs and create a crisp edge, but don't let the chamfer get too big.
2 The bonding of pipes and fittings requires the following steps:
trial assembly, marking and determination of the installation location, cleaning of the inner wall of the socket of the pipe fittings and the length of the inserted pipe end (socket depth + 10 mm), followed by wiping with cotton yarn stained with acetone. Apply the glue uniformly to the inside of the socket and the outside of the pipe end once the acetone has volatilized. It shouldn't be overly dense, but it also shouldn't be overlooked. After painting, insert and turn. All of the pipes should be put into the socket at the precise combination angle needed for installation. After two to three minutes, the pipes should be fixed on their own, and any extra adhesive that overflows from the bonding location should be wiped off to maintain the pipe clean. Now trim.Avoid forcing the direction or opening; doing so will result in leaks. The adhesive component cannot be watered or exposed to external force for a period of 24 hours after it is applied. The test can only be run following the end of the curing period.
③ A dependable seal is required for pipeline installation in order to guarantee that there are no leaks during operation. Every 1.5 to 2.0 meters, fixing devices (pipe clamps) must be placed. 
④ Due to the plastic's inherent flexibility, elevators or brackets are positioned every 0.6 meters when installing horizontal pipes to prevent distortion that could impair use.
⑤ the water supply pipe needs to be placed far from the heat source. Additionally, there should be at least 400mm of open space between the riser and the stove edge, and at least 200mm between the riser and the heating pipe.
⑥ Only after passing the pressure test following construction may the pipe be sealed with dirt.
⑦ for information on precise installation and use, please see the Ministry of Construction's pertinent construction specifications.

Application of Ball Valve:

  1. Construction pipeline system
  2. Agricultural irrigation pipeline system
  3. Pool pipeline system
  4. Industrial pipeline system
  5. Water treatment pipeline system
  6. Fishery aquaculture pipeline system

Ball Valve Benefits include: 

PVC material has steady physical qualities, is resistant to heat and acid and alkali corrosion, and is ideal for none of these situations. PVC materials can exhibit a variety of mechanical and physical characteristics by including different additives.
Advantages of Ball Valve:
  1. Extended lifespan of use.
  2. Insulation for electrical systems.
  3. Good flexibility of impact.
  4. Strong resistance to chemicals.
  5. Simple to use.
  6. Lightweight

Product Reviews
You must Login/Register to can submit your review

All Rights Reserved to AquaEnergy Expo © 2025